Culture Check
Back to Blog

Engineering Change Order (ECO)

January 3, 2023

The documentation outlining the proposed change to the design, lists the product or parts affected and requests review and approval from the manufacturers. The ECO is used to make modifications to material, assemblies and subassemblies and other types of product information. An ECO can be issued when an error is found and corrective action is taken. It is common for an ECO to be issued in technology manufacturing when an electronic component becomes obsolete or reaches the end of its life cycle.

admin

Front-End Developer

Eliminate bottlenecks.
Start with a 3-month pilot.

Book a Demo